lrjys.cn-国产精品天天狠天天看,免费人成年激情视频在线观看,免费人成在线观看视频高潮,a级毛片在线观看

Guangdong Hongyang Environmental Protection Technology Co., Ltd.
Major Purification Team,Over 10 years of technological

熱門關鍵詞:Dust removal seriesPP waste gas treatment towerActivated carbon processorUV photolysis deodorization equipmentElectrostatic oil fume purifier seriesVentilation and cooling series
Your current location:Home  >  News  >  Industry News

    Service hotline

    15989699889
    15055454299

Explanation of the debugging steps for pulse dust collectors

Source: Official website   |   Date:2017-08-01

Pulse dust collectorThe use of offline pulse cleaning technology with separate chambers overcomes the drawbacks of reverse blowing and general cleaningPulse cleaningTheir respective disadvantages include strong dust removal ability, high dust removal efficiency, low emission concentration, low air leakage rate, low energy consumption, small footprint, and reliable and stable operation. This series of dust collectors is particularly suitable for the following occasions: dust removal from calcium carbide furnaces and various electric furnaces in ferroalloy factories; Steel plant flue gas purification; Dust removal for coal-fired boilers and small boilers in power plants; Dust removal from waste incinerators; Dust removal of high-temperature flue gas in smelters; Aluminum plant flue gas purification; Dust removal at the tail and head of rotary kilns in cement plants; Carbon black plant exhaust dust removal, etc. Its application areas are characterized by high temperature and large smoke volume.
Attention for pulse dust collector debugging:
(1) Adjusting the progress valve, the valve cylinder is a buffer type. It is requested that when the valve reaches the closed position, the cylinder should enter the buffer zone, otherwise the nuts at both ends of the valve plate should be adjusted. The movement speed of the cylinder can be adjusted by the throttle valve bolts at both ends of the cylinder. We request that the closing time of the progressive valve should not exceed 2 seconds, preferably within 1 second, and the opening time can be slightly slower. Then check the gap after the valve plate is closed, which should not exceed 0.8mm. If the valve plate hole deforms after on-site welding, it should be leveled. A simpler method is to place the valve plate on the valve plate hole and find the area with large gaps and use something to level it. The above adjustments should be connected to a compressed air source, and the pressure can be adjusted through the pressure reducing valve on the air source triple connector (usually 0.3MPa), causing the valve plate to deform by 2-3mm after closing. The above speed regulation is carried out through the manual switch on the solenoid valve, without connecting to the power supply. After debugging, the manual switch should be restored, and the nuts and back nuts at both ends of the valve plate should be tightened.
(2) There are some maintenance doors for the top manhole. One end of the clamping device is arranged to be pressed tightly, and the other end is pressed tightly by the handle. The bolts and nuts are adjusted separately, so that the rubber sealing strip can be pressed tightly on the door frame after closing. When flipping open, there is no jamming phenomenon, and the bolts are locked.
Caution: When debugging the progress valve, do not let the electromagnetic pulse valve act, otherwise the strong airflow may cause harm to personnel.

(3) Adjust the transportation equipment inside the ash hopper, lock the air equipment and its transmission, and all moving parts should be lubricated.

Dongguan Hongyang Environmental Protection Technology Co., Ltd
Address: No. 1, Liuhua West Hengwu Street, Xiakou, Dongcheng District
Contact person: Mr. Yu
Mobile phone: 15989699889
Phone: 0769-23115039
Fax: 0769-23115039
Email: hy@dghyhb.com
Website:www.lrjys.cn

CopyRight ? 2024 Dongguan Hongyang Environmental protection Technology Co., LTD.   粵ICP備17054743號

Online
Service

Wechat

Hot
Line

15989699889
15055454299
7*24H Service hotline

Follow
Us

Website
TOP